Mark the requirements violated at creating a bug report inside exceution of a test run

Options
Harald Hotz-Behofsits
Harald Hotz-Behofsits Member Posts: 159
edited July 2016 in
At creation of a bug report inside a test-run, this bug report is saved with relationships to the test case and the test run. Many test-cases have several requirements as upstream relation. In most cases not all requirements are violated, so we trace the violated requirements to the bug-report.

It would be helpful, if at creation of the bug report inside a test run, a dialog would allow based on the requirements related to the test-case to mark them and trace them to the bug-report.

Comments

  • [Deleted User]
    [Deleted User] Posts: 911
    edited June 2016
    Options
    Thanks for posting this idea, Harald. I hope after our coverage and traceability work we can focus on some enhancements in the Test Center. (I know Bob hopes for that, too!)