Product Idea

Visual Indicator when Adding Test Cases to a Test Plan

  • 1.  Visual Indicator when Adding Test Cases to a Test Plan

    Posted 06-29-2017 06:14
    I love how easy it is to drag and drop Test Cases when defining a Test Plan.  After dragging several over, it becomes difficult to remember which Test Cases I have already pulled over and which ones are still candidates.

    It would be nice is there was a visual indicator in the right panel (tree structure of Test Cases) of which ones have already been assigned to this Test Plan.  That would allow us to visually see which ones are still candidates to be assigned.

    The other option would be to filter the already assigned Test Cases - removing them from the candidate list.  I would prefer the visual indicator approach so I can see the <g class="gr_ gr_687 gr-alert gr_gramm gr_inline_cards gr_run_anim Style multiReplace" id="687" data-gr-id="687">structure / context</g> of the Test Cases I am selecting from.

    Thank you for your consideration of this request.

    ------------------------------
    Larry Beers
    AECOM
    Cleveland OH
    ------------------------------