How to Sync Changes with Locked Items
Jason Barton
Member, Jama Connect Interchange™ (JCI), Jama Validation Kit (JVK) + Functional Safety Kit (FSK) Posts: 16
Use Case
- We duplicate Project X 1.0 for the next release, Project X 2.0. Most all our requirements are reviewed and are in the "accepted" state which we configured a system lock for this state
- We realize we need to make changes to Project 1.0 and we want to incorporate these changes into Project 2.0
Challenge: When we try to sync we get a message that we cannot sync because the item is locked. It would appear we need to set this requirement out of the accepted state. We tried to find a way to identify item changes in a filter, but could not find any such way to find these items. The only solution we have found is to:
- View Synced Items
- Identify the item that has been changed
- Go to that item and change the state to rework
- Go back to the synced item and push the change
This is a painstaking process to update 10s or 100s of requirements. Is there a process flow I am missing? Is there a way to push these changes that are in a locked state?
Jason
0