Cannot create baselines
Jeff Abbott
Member, Data Exchange Posts: 31
From Jama I am not able to create a baseline:
1) Select the baseline view
2) Click Add, and select the Component which contains two requirement sets of 3,648 items
3) Click Create
4) Accept the default name and Click "Save"
5) The process starts and then displays this message:
6) No baseline is created. However over time some of the baselines do appear in the list.
How can I determine if the baselines are complete?
------------------------------
Jeff Abbott
Leidos
Orlando FL
------------------------------
1) Select the baseline view
2) Click Add, and select the Component which contains two requirement sets of 3,648 items
3) Click Create
4) Accept the default name and Click "Save"
5) The process starts and then displays this message:
6) No baseline is created. However over time some of the baselines do appear in the list.
How can I determine if the baselines are complete?
------------------------------
Jeff Abbott
Leidos
Orlando FL
------------------------------
0
Comments
-
Similar issue:
Recently I had issues in creating a baseline (with several thousand items in it) and I got a "Failed to execute send on XMLHttpRequest: Failed to load". After a while the baseline was there.
------------------------------
Alessandro
Systems Engineer
SICK AG
------------------------------
-------------------------------------------
Original Message:
Sent: 10-10-2022 06:28
From: Jeff Abbott
Subject: Cannot create baselines
From Jama I am not able to create a baseline:
1) Select the baseline view
2) Click Add, and select the Component which contains two requirement sets of 3,648 items
3) Click Create
4) Accept the default name and Click "Save"
5) The process starts and then displays this message:
6) No baseline is created. However over time some of the baselines do appear in the list.
How can I determine if the baselines are complete?
------------------------------
Jeff Abbott
Leidos
Orlando FL
------------------------------
Alessandro
Systems Engineer
SICK AG0