Auto transition status between linked requirements in Jama
Liviu
Member, Automotive Solution Posts: 2
Hi,
I am not sure if Jama is doing this so I will ask the following question:
I would like to have a change in transition related on Relationship between an Upstream Item and the linked items from Downstream.
For example: I have one or multiple requirements linked to a main requirement. If the status is changed in the Downstream requirement into Implemented, I would like to have the main requirement (Upstream requirement) automatically changed in Implemented.
Thanks!
------------------------------
Liviu
------------------------------
0